Vesgantti 106" Cloud Couch Sectional Modular Sofa, Deep Seat Comfy Cloud Couch Chenille Memory Foam Sofa Modular Couches for Living Room Bedroom, No Assembly Required (Beige, Left-Facing Chaise)

Vesgantti 106" Cloud Couch Sectional Modular Sofa, Deep Seat Comfy Cloud Couch Chenille Memory Foam Sofa Modular Couches for Living Room Bedroom, No Assembly Required (Beige, Left-Facing Chaise)

$989.98 USD
Sale price  $989.98 USD Regular price 
Skip to product information
Vesgantti 106" Cloud Couch Sectional Modular Sofa, Deep Seat Comfy Cloud Couch Chenille Memory Foam Sofa Modular Couches for Living Room Bedroom, No Assembly Required (Beige, Left-Facing Chaise)

Vesgantti 106" Cloud Couch Sectional Modular Sofa, Deep Seat Comfy Cloud Couch Chenille Memory Foam Sofa Modular Couches for Living Room Bedroom, No Assembly Required (Beige, Left-Facing Chaise)

$989.98 USD
Sale price  $989.98 USD Regular price 
Shipping calculated at checkout.

About This

  • Comfortable Support: Expertly engineered with a high-density foam and spring system that delivers the perfect balance of plush softness and supportive structure—the integrated spring system provides lasting resilience and extended durability, while the memory foam delivers a sensation of cloud-like comfort. Designed for ultimate relaxation, the generous 28" seat depth, elevated back cushion and arcuate armrests create an inviting lounging oasis, while the spacious 58" chaise lounge offers ample room to stretch out. Thoughtfully incorporated ergonomic features ensure ideal support for prolonged sitting or reclining
  • Fully Modular Design: This modular sofa offers ultimate flexibility with a total width of 106". You can easily rearrange the couch pieces to fit different spaces and needs—Whether arranged in an L-shape or placed side by side, it effortlessly adapts to diverse needs—from creating a snug reading nook to hosting movie nights with friends, enjoying laid-back family moments, or converting into a convenient sofa bed for guests. The sectional sofa's spacious design and modular construction makes moving and rearraning a piece of cake
  • No Assembly Required: Vesgantti cloud sofa arrives tool-free and vacuum-packed for effortless setup. Simply unbox, allow it to expand for up to 72 hours, and it’s ready to enjoy! Our boneless cloud couch can be placed on either side for customizable comfort—start relaxing from the moment you get it. Note: Minor wrinkles are normal after compression, and cushions may take up to three days to fully regain their fluffiness
  • Available in 6 Color Options: Two premium fabrics include plush corduroy couch and luxurious chenille couch—both offering exceptional comfort, lasting durability, and easy upkeep. These skin-friendly, pet-resistant materials withstand scratching while maintaining their softness, perfect for families with children and pets. For added convenience, the removable throw pillow covers and back cushion covers are machine-washable, effortlessly blending style with practicality—ideal for anyone seeking a fresh, low-maintenance sectional couches for living room
  • Space-Savvy Modular Comfort: Engineered for space-conscious living, this versatile fluffy sofa adapts seamlessly to any environment—from compact apartments to family rooms and small living spaces. Its innovative legless, minimalist design fits various decor styles, making it a versatile addition to different living spaces. For convenient delivery, the foam couch ships in two separate boxes (which may arrive at different times). Your satisfaction is guaranteed—should the product not meet your expectations, our dedicated customer service team will promptly provide a satisfactory resolution

Overview

  • Brand : Vesgantti
  • Assembly Required : No
  • Seat Depth : 28 inches
  • Seat Height : 16.9 Inches
  • Weight Limit : 1000 Pounds
  • Product Dimensions : 68.5"D x 106"W x 25.6"H
  • Item Weight : 89 Pounds
  • Type : Sectional
  • Color : Chenille - Beige
  • Special Feature : Deep Seat, Fire Retardant, High-Density Foam with Spring, No Assembly Required, Scratch Resistant
  • Seating Capacity 4.0 : Style Contemporary
  • : Seating Capacity 4.0
  • : Style Contemporary
  • Shape L-Shape : Frame Material Engineered Wood
  • : Shape L-Shape
  • : Frame Material Engineered Wood